How it Works
STEP 1
PREP & SETUP
Prep by covering any openings that won’t be sealed. This includes taping or covering any designed openings or finished horizontal surfaces within the space. Emitters are then set up throughout the area to be air sealed. The AeroBarrier Connect system is then set up. It includes a blower door, nozzle stations and hoses, a fan with lay-flat tubing and the master control unit
Step 2
Pressurize and apply
Using a blower door assembly, the space is then pressurized. After that, a computer controls the entire process including the temperature, pressure, humidity and the distribution of sealant emitted within the space.
Step 3
Seal and monitor
With the AeroBarrier Connect system, you see results in real-time. You have complete control over your desired level of airtightness and can achieve any level required. At the end of the process, a final blower door test is run to verify the air sealing results. Your AeroBarrier technician will then provide a Certificate of Completion that shows pre and post leakage.
Step 4
Clean up
After the air sealing is complete, work can resume within the space in 30 minutes. At that time, clean up of all equipment and removal of all tape and coverings will occur.